Skip to content
StreamScapeX

Critical Path

The engineering journey to Starship and beyond.

  • 2026
  • 34m
Rating: 10.0 out of 10TMDB(1 votes)

Overview

Critical Path offers an exclusive, behind-the-scenes look at the engineering marvel that is the SpaceX Starship program. The documentary details the iterative design philosophy, the high-stakes testing, and the relentless drive to build the largest and most powerful rocket ever flown. From the first conceptual sketches to the atmospheric re-entry and landing attempts, this film chronicles the single, complex path of innovation required to make life multi-planetary.

Fun facts

Details

Status
Released
Release date
July 10, 2026
Original language
English
Collection
SpaceX Starship Documentary Series

Cast

More like this